中图分类
执行
    会议名称
    执行
    中文(共0篇) 外文(共322篇)
    排序:
    导出 保存至文件
    [会议]   JIANG Guocheng   ZHAO Zengkai        International Conference on Hydropower        2004年      共 5 页
    摘要 : China started CFRD construction with modern technologies since the middle of the 1980s. Till the end of 2003, there are more than 110 CFRDs constructed or under construction. Among them, 31 CFRDs have a height over 100m. This pape... 展开

    摘要 : China started CFRD construction with modern technologies since the middle of the 1980s. Till the end of 2003, there are more than 110 CFRDs constructed or under construction. Among them, 31 CFRDs have a height over 100m. This pape... 展开

    [会议]   Xi Lu   Jing Liu   Shengjie Di   Yang Ji        International symposium on power electronics and control engineering        2021年4th届      共 5 页
    摘要 : Geosynthetics have a great development prospect in seepage prevention of water retaining buildings because of their reliability and economic superiority. Geomembrane impermeable rockfill dam development at home and abroad also hig... 展开

    [会议]   Pedro L.Marques Filho   Juan Enrique Filloy   Alex M.Calcina        International symposium on rockfill dams        2009年1st届      共 9 页
    摘要 : El Cajón dam,Mexico,has a 188 m high concrete-face rockfill dam. A very extensive campaign of investigations was carried out for its design,as described in a previous paper[1].Some additional data about his behavior after complet... 展开

    [会议]   Pedro L.Marques Filho   Juan Enrique Filloy   Alex M.Calcina        International Symposium on Concrete Faced Rockfill Dams        2009年1st届      共 9 页
    摘要 : El Cajón dam,Mexico,has a 188 m high concrete-face rockfill dam. A very extensive campaign of investigations was carried out for its design,as described in a previous paper[1].Some additional data about his behavior after complet... 展开

    [会议]   Chen Jiyao   Yan ShuSen        International Symposium on Concrete Faced Rockfill Dams        2000年      共 9 页
    摘要 : The Shuibuya Hydro Development, located on the Qingjiang River, a tributary of the Yangtze River, is a concrete faced rockfill dam (CFRD) with a height of 232 m. At the stage of feasibility study, field tests of blasting and compa... 展开

    [会议]   Chen Jiyao   Yan ShuSen        International Symposium on Concrete Faced Rockfill Dams (CFRD 2000)        2000年;届      共 9 页
    摘要 : The Shuibuya Hydro Development, located on the Qingjiang River, a tributary of the Yangtze River, is a concrete faced rockfill dam (CFRD) with a height of 232 m. At the stage of feasibility study, field tests of blasting and compa... 展开

    [会议]          International Conference on Long Time Effects and Seepage Behavior of Dams        2008年1st届      共 11 页
    摘要 : Karntner Elektrizit(a)ts-AG (KELAG) in Carinthia operates several hydropower plants with embankment dams, ranging from small structures of compensation basins to 100 m high rockfill dams. Most of the hydropower plants, producing e... 展开

    [会议]   J.Wilford   M.Pellant   M.Wicklow-Howard        International Conference on Long Time Effects and Seepage Behavior of Dams        2008年1st届      共 11 页
    摘要 : Karntner Elektrizit(a)ts-AG (KELAG) in Carinthia operates several hydropower plants with embankment dams, ranging from small structures of compensation basins to 100 m high rockfill dams. Most of the hydropower plants, producing e... 展开

    [会议]   Alexius Vogel        International Symposium on Concrete Faced Rockfill Dams        2009年1st届      共 7 页
    摘要 : Approximately 1600 cases of dam failures are reported in the Western World.Including failures in China and Russia more than 5100 cases can be counted.In the Western World 56 failures of rockfill dams are registered. An overview,ca... 展开
    关键词 : rockfill dam     dam failure     failure analysis     failure cause  

    研究趋势
    相关热图
    学科分类